top of page
Power Generation
Cogen - Picture.PNG
Cottage Grove Facility_edited.jpg
small_2-large_edited.jpg

Nevada Cogeneration Associates No.2
Location: Las Vegas, NV
Capacity: 85 MW
Fuel: Natural Gas
Acquired: January 2020

Cottage Grove Cogeneration
Location: Minneapolis-St.Paul, MN
Capacity: 265 MW
Fuel: Natural Gas/ULSD
Acquired: January 2021

Twin Oaks Power Station
Location: Bremond, TX
Capacity: 310 MW
Fuel: Lignite
Acquired: August 2023

image_edited.jpg

Sunnyside Cogeneration Associates
Location: East Carbon, UT
Capacity: 58 MW
Fuel: Waste Coal
Acquired: September 2023

Mining Operations
image.png

Calvert Mine
Location: Bremond, TX
Reserves: ~19,000,000 tons 
Fuel: Lignite
Acquired: August 2023

image_edited_edited_edited.jpg

SCA Pile
Location: East Carbon, UT
Reserves: ~3,000,000 tons
Fuel: Waste Coal
Acquired: September 2023

image.png

Star Point Pile
Location: Carbon County, UT
Reserves: ~1,300,000 tons
Fuel: Waste Coal
Acquired: September 2023

bottom of page